Course Content
Lessons
Status
1
2.28 Transporting & placing
-
2.28.01 Contents
-
2.28.02 Summary and objectives
-
2.28.03 Introduction
-
2.28.04 Introduction 1
-
2.28.05 Choice of methods 1
-
2.28.06 Choice of methods 2
-
2.28.07 Principal transporting method
-
2.28.08 Tipper trucks 1
-
2.28.09 Tipper trucks 2
-
2.28.10 Truckmixers 1
-
2.28.11 Truckmixers 2
-
2.28.12 Chutes
-
2.28.13 Concrete pumps 1
-
2.28.14 Concrete pumps 2
-
2.28.15 Concrete pumps 3
-
2.28.16 Concrete pumps 4
-
2.28.17 Concrete pumps 5
-
2.28.18 Concrete pumps 6
-
2.28.19 Concrete pumps 7
-
2.28.20 Concrete pumps 8
- 2.28.01 Contents
- 2.28.02 Summary and objectives
- 2.28.03 Introduction
- 2.28.04 Introduction 1
- 2.28.05 Choice of methods 1
- 2.28.06 Choice of methods 2
- 2.28.07 Principal transporting method
- 2.28.08 Tipper trucks 1
- 2.28.09 Tipper trucks 2
- 2.28.10 Truckmixers 1
- 2.28.11 Truckmixers 2
- 2.28.12 Chutes
- 2.28.13 Concrete pumps 1
- 2.28.14 Concrete pumps 2
- 2.28.15 Concrete pumps 3
- 2.28.16 Concrete pumps 4
- 2.28.17 Concrete pumps 5
- 2.28.18 Concrete pumps 6
- 2.28.19 Concrete pumps 7
- 2.28.20 Concrete pumps 8
2
2.29 Compacting & finishing
-
2.29.01 Contents
-
2.29.02 Summary and objectives
-
2.29.03 Introduction 1
-
2.29.04 Introduction 2
-
2.29.05 Introduction 3
-
2.29.06 Poker vibrator types
-
2.29.07 Range of poker vibrators
-
2.29.08 Radius of action 1
-
2.29.09 Radius of action 2
-
2.29.10 Length of head
-
2.29.11 Compact concrete time
-
2.29.12 Using a poker vibrator 1
-
2.29.13 Using a poker vibrator 2
-
2.29.14 Using a poker vibrator 3
-
2.29.15 Using a poker vibrator 4
-
2.29.16 Surface vibrators 1
-
2.29.17 Surface vibrators 2
-
2.29.18 Surface vibrators 3
-
2.29.19 Surface vibrators 4
-
2.29.20 Long-span beam vibrators
- 2.29.01 Contents
- 2.29.02 Summary and objectives
- 2.29.03 Introduction 1
- 2.29.04 Introduction 2
- 2.29.05 Introduction 3
- 2.29.06 Poker vibrator types
- 2.29.07 Range of poker vibrators
- 2.29.08 Radius of action 1
- 2.29.09 Radius of action 2
- 2.29.10 Length of head
- 2.29.11 Compact concrete time
- 2.29.12 Using a poker vibrator 1
- 2.29.13 Using a poker vibrator 2
- 2.29.14 Using a poker vibrator 3
- 2.29.15 Using a poker vibrator 4
- 2.29.16 Surface vibrators 1
- 2.29.17 Surface vibrators 2
- 2.29.18 Surface vibrators 3
- 2.29.19 Surface vibrators 4
- 2.29.20 Long-span beam vibrators
3
2.30 Curing
-
2.30.01 Contents
-
2.30.02 Summary and objectives
-
2.30.03 Introduction
-
2.30.04 Hydration
-
2.30.05 Importance of curing
-
2.30.06 Plastic shrinkage
-
2.30.07 Evaporation
-
2.30.08 Curing times 1
-
2.30.09 Curing times 2
-
2.30.10 Minimum curing periods
-
2.30.11 Methods of curing – Introduction
-
2.30.12 Leaving formwork in place
-
2.30.13 Polythene sheeting
-
2.30.14 Ponding
-
2.30.15 Sprayed-on membranes
-
2.30.16 Water spraying/sprinkling, Damp sand
-
2.30.17 Damp hessian
-
2.30.18 Formwork striking 1
-
2.30.19 Formwork striking 2
-
2.30.20 Accelerated curing 1
- 2.30.01 Contents
- 2.30.02 Summary and objectives
- 2.30.03 Introduction
- 2.30.04 Hydration
- 2.30.05 Importance of curing
- 2.30.06 Plastic shrinkage
- 2.30.07 Evaporation
- 2.30.08 Curing times 1
- 2.30.09 Curing times 2
- 2.30.10 Minimum curing periods
- 2.30.11 Methods of curing – Introduction
- 2.30.12 Leaving formwork in place
- 2.30.13 Polythene sheeting
- 2.30.14 Ponding
- 2.30.15 Sprayed-on membranes
- 2.30.16 Water spraying/sprinkling, Damp sand
- 2.30.17 Damp hessian
- 2.30.18 Formwork striking 1
- 2.30.19 Formwork striking 2
- 2.30.20 Accelerated curing 1
4
2.31 Concreting in hot/cold weather
-
2.31.01 Contents
-
2.31.02 Summary and objectives
-
2.31.03 Introduction
-
2.31.04 Concrete production and supply
-
2.31.05 Concreting on site 1
-
2.31.06 Concreting on site 2
-
2.31.07 Concreting onsite 3
-
2.31.08 Concreting on site 4
-
2.31.09 Cold weather 1
-
2.31.10 Cold weather 2
-
2.31.11 Cold weather 3
-
2.31.12 End of unit tests
- 2.31.01 Contents
- 2.31.02 Summary and objectives
- 2.31.03 Introduction
- 2.31.04 Concrete production and supply
- 2.31.05 Concreting on site 1
- 2.31.06 Concreting on site 2
- 2.31.07 Concreting onsite 3
- 2.31.08 Concreting on site 4
- 2.31.09 Cold weather 1
- 2.31.10 Cold weather 2
- 2.31.11 Cold weather 3
- 2.31.12 End of unit tests
5
2.32 Joints
-
2.32.01 Contents
-
2.32.02 Summary and objectives
-
2.32.03 Introduction 1
-
2.32.04 Introduction 2
-
2.32.05 Construction joints 1
-
2.32.06 Construction joints 2
-
2.32.07 Construction joints 3
-
2.32.08 Preparation 1
-
2.32.09 Preparation 2
-
2.32.10 Washing and brushing
-
2.32.11 Air and water jetting
-
2.32.12 Wire brushing
-
2.32.13 Mechanical scabbling
-
2.32.14 Stop-ends 1
-
2.32.15 Stop-ends 2
-
2.32.16 Removal of debris
-
2.32.17 Grouts and mortars
-
2.32.18 Formwork considerations
-
2.32.19 Masking
-
2.32.20 Placing fresh concrete
- 2.32.01 Contents
- 2.32.02 Summary and objectives
- 2.32.03 Introduction 1
- 2.32.04 Introduction 2
- 2.32.05 Construction joints 1
- 2.32.06 Construction joints 2
- 2.32.07 Construction joints 3
- 2.32.08 Preparation 1
- 2.32.09 Preparation 2
- 2.32.10 Washing and brushing
- 2.32.11 Air and water jetting
- 2.32.12 Wire brushing
- 2.32.13 Mechanical scabbling
- 2.32.14 Stop-ends 1
- 2.32.15 Stop-ends 2
- 2.32.16 Removal of debris
- 2.32.17 Grouts and mortars
- 2.32.18 Formwork considerations
- 2.32.19 Masking
- 2.32.20 Placing fresh concrete
6
2.33 Concrete finishes
-
2.33.01 Contents
-
2.33.02 Summary and objectives
-
2.33.03 Introduction
-
2.33.04 Sources of information
-
2.33.05 Formed surfaces
-
2.33.06 Unformed surfaces
-
2.33.07 Direct and indirect
-
2.33.08 Direct formed
-
2.33.09 Direct unformed 1
-
2.33.10 Direct unformed 2
-
2.33.11 Indirect formed 1
-
2.33.12 Indirect formed 2
-
2.33.13 Indirect formed 3
-
2.33.14 Indirect formed 4
-
2.33.15 Indirect unformed
-
2.33.16 Concrete production intro
-
2.33.17 Cements
-
2.33.18 Aggregates
-
2.33.19 Water
-
2.33.20 Admixtures
- 2.33.01 Contents
- 2.33.02 Summary and objectives
- 2.33.03 Introduction
- 2.33.04 Sources of information
- 2.33.05 Formed surfaces
- 2.33.06 Unformed surfaces
- 2.33.07 Direct and indirect
- 2.33.08 Direct formed
- 2.33.09 Direct unformed 1
- 2.33.10 Direct unformed 2
- 2.33.11 Indirect formed 1
- 2.33.12 Indirect formed 2
- 2.33.13 Indirect formed 3
- 2.33.14 Indirect formed 4
- 2.33.15 Indirect unformed
- 2.33.16 Concrete production intro
- 2.33.17 Cements
- 2.33.18 Aggregates
- 2.33.19 Water
- 2.33.20 Admixtures
7
2.34 External concrete slabs
-
2.34.01 Contents
-
2.34.02 Summary and objectives
-
2.34.03 Introduction
-
2.34.04 Structure of concrete pavements
-
2.34.05 Subgrade
-
2.34.06 Capping layer
-
2.34.07 Sub-base 1
-
2.34.08 Sub-base 2
-
2.34.09 Sub-base 3
-
2.34.10 Sub-base 4
-
2.34.11 Pavement quality concrete 1
-
2.34.12 Pavement quality concrete 2
-
2.34.13 Joints 1
-
2.34.14 Joints 2
-
2.34.15 Thickness
-
2.34.16 Jointed URC pavements
-
2.34.17 URC method of construction
-
2.34.18 JRC pavements
-
2.34.19 JRC method of construction
-
2.34.20 CRC pavements
- 2.34.01 Contents
- 2.34.02 Summary and objectives
- 2.34.03 Introduction
- 2.34.04 Structure of concrete pavements
- 2.34.05 Subgrade
- 2.34.06 Capping layer
- 2.34.07 Sub-base 1
- 2.34.08 Sub-base 2
- 2.34.09 Sub-base 3
- 2.34.10 Sub-base 4
- 2.34.11 Pavement quality concrete 1
- 2.34.12 Pavement quality concrete 2
- 2.34.13 Joints 1
- 2.34.14 Joints 2
- 2.34.15 Thickness
- 2.34.16 Jointed URC pavements
- 2.34.17 URC method of construction
- 2.34.18 JRC pavements
- 2.34.19 JRC method of construction
- 2.34.20 CRC pavements
8
2.35 Internal concrete slabs
-
2.35.01 Contents
-
2.35.02 Summary and objectives
-
2.35.03 Introduction 1
-
2.35.04 Introduction 2
-
2.35.05 Main operations
-
2.35.06 Construction methods
-
2.35.07 Large area pouring 1
-
2.35.08 Large area pouring 2
-
2.35.09 Long strip construction
-
2.35.10 Finishing 1
-
2.35.11 Finishing 2
-
2.35.12 Finishing 3
-
2.35.13 Structure of ICS
-
2.35.14 Sub-grade
-
2.35.15 Sub-base 1
-
2.35.16 Sub-base 2
-
2.35.17 Underlay
-
2.35.18 Base layout
-
2.35.19 Joints
-
2.35.20 Construction joints 1
- 2.35.01 Contents
- 2.35.02 Summary and objectives
- 2.35.03 Introduction 1
- 2.35.04 Introduction 2
- 2.35.05 Main operations
- 2.35.06 Construction methods
- 2.35.07 Large area pouring 1
- 2.35.08 Large area pouring 2
- 2.35.09 Long strip construction
- 2.35.10 Finishing 1
- 2.35.11 Finishing 2
- 2.35.12 Finishing 3
- 2.35.13 Structure of ICS
- 2.35.14 Sub-grade
- 2.35.15 Sub-base 1
- 2.35.16 Sub-base 2
- 2.35.17 Underlay
- 2.35.18 Base layout
- 2.35.19 Joints
- 2.35.20 Construction joints 1