3.25 Precast concrete
-
3.25.00 Contents
-
3.25.01 Summary and ICT learning objectives
-
3.25.02 Introduction
-
3.25.03 Principles of precast concrete production
-
3.25.04 Layout of facilities for the production of precast concrete
-
3.25.05 Design/drawing office
-
3.25.06 Production control
-
3.25.07 Reinforcement cutting, bending and folding
-
3.25.08 Mould fabrication
-
3.25.09 Batching, mixing and transporting fresh concrete
-
3.25.10 Casting
-
3.25.11 Finishing
-
3.25.12 Curing
-
3.25.13 Marking
-
3.25.14 Lifting and handling concrete products
-
3.25.15 Storage and stacking
-
3.25.16 Inspection, sampling and testing
-
3.25.17 Quality management and control
-
3.25.18 Loading and transporting
-
3.25.19 Erection and assembly on site
- 3.25.00 Contents
- 3.25.01 Summary and ICT learning objectives
- 3.25.02 Introduction
- 3.25.03 Principles of precast concrete production
- 3.25.04 Layout of facilities for the production of precast concrete
- 3.25.05 Design/drawing office
- 3.25.06 Production control
- 3.25.07 Reinforcement cutting, bending and folding
- 3.25.08 Mould fabrication
- 3.25.09 Batching, mixing and transporting fresh concrete
- 3.25.10 Casting
- 3.25.11 Finishing
- 3.25.12 Curing
- 3.25.13 Marking
- 3.25.14 Lifting and handling concrete products
- 3.25.15 Storage and stacking
- 3.25.16 Inspection, sampling and testing
- 3.25.17 Quality management and control
- 3.25.18 Loading and transporting
- 3.25.19 Erection and assembly on site
2
3.26 Concrete repairs
-
3.26.00 Contents
-
3.26.01 ICT learning objectives and Summary
-
3.26.02 Introduction
-
3.26.03 Repair situations
-
3.26.04 Inspection procedures
-
3.26.05 Types of repair materials
-
3.26.06 Performance characteristics and test methods for repair materials
-
3.26.07 Repair of cracks and voids
-
3.26.08 Surface repairs
-
3.26.09 Repair of damage from reinforcement corrosion
-
3.26.10 Electrochemical techniques
-
3.26.11 Surface treatment
-
3.26.12 End of Unit Test
- 3.26.00 Contents
- 3.26.01 ICT learning objectives and Summary
- 3.26.02 Introduction
- 3.26.03 Repair situations
- 3.26.04 Inspection procedures
- 3.26.05 Types of repair materials
- 3.26.06 Performance characteristics and test methods for repair materials
- 3.26.07 Repair of cracks and voids
- 3.26.08 Surface repairs
- 3.26.09 Repair of damage from reinforcement corrosion
- 3.26.10 Electrochemical techniques
- 3.26.11 Surface treatment
- 3.26.12 End of Unit Test
4
3.28 Concrete roads and ground slabs
-
3.28.00 Contents
-
3.28.01 Summary and ICT learning objectives
-
3.28.02 Introduction
-
3.28.03 Pavement types and structure
-
3.28.04 Foundation construction with unbound material
-
3.28.05 Types, constituents and properties of HBMs
-
3.28.06 Mixing, compacting and placing HBMs
-
3.28.07 Joints in CBGM and RCC
-
3.28.08 Tests for HBMs
-
3.28.09 Specification of HBMs
-
3.28.10 Production control and conformity testing
-
3.28.11 Rigid and rigid composite construction with PQC
-
3.28.12 Constituents of PQC
-
3.28.13 PQC specification, properties and proportions
-
3.28.14 Joints and joint assemblies in PQC
-
3.28.15 Placing PQC
-
3.28.16 Finishing and texturing PQC surfaces
-
3.28.17 Specification of surface levels and finishes
-
3.28.18 Acceptance, production control and conformity tests for PQC
-
3.28.19 End of unit self-test
- 3.28.00 Contents
- 3.28.01 Summary and ICT learning objectives
- 3.28.02 Introduction
- 3.28.03 Pavement types and structure
- 3.28.04 Foundation construction with unbound material
- 3.28.05 Types, constituents and properties of HBMs
- 3.28.06 Mixing, compacting and placing HBMs
- 3.28.07 Joints in CBGM and RCC
- 3.28.08 Tests for HBMs
- 3.28.09 Specification of HBMs
- 3.28.10 Production control and conformity testing
- 3.28.11 Rigid and rigid composite construction with PQC
- 3.28.12 Constituents of PQC
- 3.28.13 PQC specification, properties and proportions
- 3.28.14 Joints and joint assemblies in PQC
- 3.28.15 Placing PQC
- 3.28.16 Finishing and texturing PQC surfaces
- 3.28.17 Specification of surface levels and finishes
- 3.28.18 Acceptance, production control and conformity tests for PQC
- 3.28.19 End of unit self-test
5
3.29 Plant
-
3.29.00 Contents
-
3.29.01 Summary and ICT learning objectives
-
3.29.02 Introduction
-
3.29.03 Automatically-controlled production plants
-
3.29.04 Autographic recording systems
-
3.29.05 Control of water content and consistence
-
3.29.06 Plant for transporting concrete
-
3.29.07 Plant for placing concrete
-
3.29.08 Plant for compacting concrete
-
3.29.09 Plant for finishing concrete
-
3.29.10 Compacting and finishing special concretes
-
3.29.11 Conclusion
-
3.29.12 End of unit self-test
- 3.29.00 Contents
- 3.29.01 Summary and ICT learning objectives
- 3.29.02 Introduction
- 3.29.03 Automatically-controlled production plants
- 3.29.04 Autographic recording systems
- 3.29.05 Control of water content and consistence
- 3.29.06 Plant for transporting concrete
- 3.29.07 Plant for placing concrete
- 3.29.08 Plant for compacting concrete
- 3.29.09 Plant for finishing concrete
- 3.29.10 Compacting and finishing special concretes
- 3.29.11 Conclusion
- 3.29.12 End of unit self-test